Whole-House Remodeling
Additions, basements, and taking a dated house back to the studs — rebuilt around how you actually live, on one contract and one schedule.
Older Triangle houses are often well built and badly laid out — good bones, closed-off rooms, a kitchen sized for 1985. A whole-house remodel is worth it when the location is right and the floor plan is the problem.
This is also where additions and basement finishing live, because in practice they are the same job: structural work, every trade in sequence, and one person accountable for the schedule.
Additions
An addition is the largest thing most homeowners will ever build, and the part that decides whether it looks right is the tie-in — how the new roofline meets the old one, whether the siding and trim read as original, whether the floor heights line up. Done well, nobody can tell where the house ends and the addition begins.
Not every lot supports every addition. Setbacks, easements, and the existing foundation all constrain what is possible, and it is worth knowing that before you pay for drawings. Additions need stamped plans and usually a structural engineer; that gets coordinated so you have one point of contact rather than three.
Basements
The least expensive way to add real living space, because the foundation, roof, and shell already exist. Cost comes down to three things: whether you need a bathroom, whether you need egress, and whether the space is dry.
Any basement bedroom needs a code-compliant egress window or door. That is not optional, and it is the item most likely to be missing from a cheap quote — cutting a foundation wall is real work. It gets priced up front rather than discovered later. And if the space takes on water, finishing it is throwing money away; we look at grading, gutters, and the foundation first and will say so even though it is not the job you called about.
Phasing
Whole-house work can be done all at once with the house empty, or in phases while you live in part of it. All at once is faster and usually cheaper per square foot; phased is more disruptive but keeps you in the house. We lay out both with real dates before you decide.
What tends to surprise people
Once walls are open, older homes give up their secrets — undersized electrical, failed subfloor, plumbing that was never quite right, occasionally something structural. Those are not upsells; they are the reason the allowance line exists. You hear about anything we find the day we find it, with the cost and the options in writing, before the work happens.
Tell us about your whole house project
Thinking about a project this year?
Tell us what you have in mind and you get a written estimate with the line items broken out — no charge, and no obligation.